Ingersoll Current/Ongoing Capital Projects
Project Name | Brief Scope | Drawings | Notices | Schedule | Contact |
---|---|---|---|---|---|
Pemberton Street – Phase 2 Reconstruction | The project consists of full road reconstruction, including curb and gutter, asphalt roadway, multi-use asphalt trail (North Town Line to Carnegie) and concrete sidewalk (Carnegie to CN Railway), replacement of sanitary sewer, storm sewer, and watermain, in the area of King Hiram Street. | View | View | Late spring to early summer 2025. | Nick Moore Engineering Technologist 519-485-0120 engineering@ingersoll.ca |
Earl Street - Reconstruction | The reconstruction involves the installation of sanitary and storm sewers and new asphalt road surface, including curb and gutter. A 1.5m wide concrete sidewalk will replace the existing sidewalk on the east side of Earl Street. The existing asphalt/concrete sidewalk on the east-side will be removed. | View | View | Late summer to early fall 2025 | Salam Radhaa Engineering Intern 519-485-0120 engineering@ingersoll.ca |
Contact Us
Town of Ingersoll
130 Oxford Street (2nd Floor), Ingersoll, ON, N5C 2V5, Map this location
Phone: 519-485-0120, Email Us